West Yorkshire Electrical provided a tailored electrical upgrade that met Spensall Engineering’s requirements while minimising operational disruption. A 300A electrical supply upgrade was installed to handle the increased energy demand, ensuring that all high powered machinery could operate efficiently. New distribution boards were designed and installed to optimise power distribution across the facility, reducing strain on circuits and improving overall reliability. Dedicated power feeds were implemented for the new welding robots, allowing them to function safely and effectively. To maximise space and maintain a clean working environment, a suspended cable ladder system was installed, keeping power distribution organised and secure. All work was scheduled around production hours, allowing the project to be completed with minimal downtime.